NR632 Wk2 BA Discussion
NR632 Wk2 BA Discussion
Purpose
The monitoring and controlling of processes and outputs is critical to the success of the project. It is the responsibility of the project manager (PM) to measure the progress toward achieving the objectives while monitoring any deviations from the plan and initiating immediate corrective action to avert negative consequences to the project. The project manager must make sure that the I’s are dotted, and the T’s are crossed. NR632 Wk2 BA Discussion
To assist you, there is a template and sample of a monitor and control document based on the project management knowledge areas located here:
ORDER NOW FOR COMPREHENSIVE, PLAGIARISM-FREE PAPERS
Requirements
- Write a 1-2 page scholarly section, utilizing APA format, describing the process of monitor and control in project management
- Complete all sections of the monitor and control document.
- Grammar, spelling, punctuation, references, and citations are consistent with formal academic writing and APA format as expressed in the current edition.
Preparing the Paper
- All monitoring and controlling strategies used during the project must be identified in the monitor and control document.
- Ideas and information from professional sources must be cited correctly using the Current Edition of the APA manual.
- Grammar, spelling, punctuation, references, and citations are consistent with formal academic writing.
-
NR632W2MonitorControlDocumentsGuidelinesandRubric_JAN20.docx
Monitor-and-Control Documents
Guidelines and Scoring Rubric
Purpose
The monitoring and controlling of processes and outputs is critical to the success of the project. It is the responsibility of the project manager (PM) to measure the progress toward achieving the objectives while monitoring any deviations from the plan and initiating immediate corrective action to avert negative consequences to the project. The project manager must make sure that the I’s are dotted, and the T’s are crossed.
To assist you, there is a template and sample of a monitor and control document based on the project management knowledge areas in Course Resources.
Due Date: Sunday 11:59 PM MT at the end of Week 2
Total Points Possible: 100
Requirements:
1. Write a 1-2 page scholarly section, utilizing APA format, describing the process of monitor and control in project management
2. Complete all sections of the monitor and control document.
3. Grammar, spelling, punctuation, references, and citations are consistent with formal academic writing and APA format as expressed in the current edition.
Preparing the paper
1. All monitoring and controlling strategies used during the project must be identified in the monitor and control document.
1. Ideas and information from professional sources must be cited correctly using the current Edition of the APA manual.
1. Grammar, spelling, punctuation, references, and citations are consistent with formal academic writing.
Category Points % Description Monitor and Control document 80 80 All of the monitoring and controlling strategies used during the project must be identified in the monitor and control document. The monitor/control template is complete. The student includes the requested summary paragraph. The monitor/control template is attached as an appendix to a scholarly discussion of the monitor and control process Grammar, spelling, punctuation, references, citations, and APA formatting 20 20 Grammar, spelling, punctuation, references, and citations are consistent with formal academic writing and APA format as expressed in the current edition. Total 100 100 A quality assignment will meet or exceed all of the above requirements. Chamberlain College of Nursing NR632 Nurse Executive Concluding Graduate Experience II
2 Grading Rubric
Assignment Criteria Exceptional (100%)
Outstanding or highest level of performance
Exceeds (88%)
Very good or high level of performance
Meets (80%)
Competent or satisfactory level of performance
Needs Improvement (38%)
Poor or failing level of performance
Developing (0)
Unsatisfactory level of performance
Content Possible Points = 80 Points
Monitor and Control Document 80 Points 70 Points 64 Points 30 Points 0 Points The monitor and control document thoroughly reflects the monitoring and controlling strategies that were necessary for this project. All knowledge areas are addressed in the document, and all frequencies greater than 5 or rated as F or E are described. A summary is provided that addresses all process and control strategies used during the project. The template is attached as an appendix to a scholarly section The monitor and control document adequately reflects the monitoring and controlling strategies that were necessary for this project. The monitor/control table is complete and all frequencies greater than 5, or rated as F or E, are described. The summary is not thorough and addresses only some but not all process and control strategies used during the project. The monitor and control document barely reflects the monitoring and controlling strategies that were necessary for this project. Not all frequencies greater than 5 or rated as F or E are described. A summary is not provided and/or the template is not attached as an appendix to a scholarly section in APA format All knowledge areas are not addressed in the document. No frequencies greater than 5 or rated as F or E are described, and no summary is provided that addresses process and control strategies used during the project Neither the monitor/control template nor the scholarly section of the assignment were submitted. Content Subtotal _____of 80 points Format Possible Points = 20 Points
Grammar, spelling, punctuation, references, citations, and APA formatting 20 Points 18 Points 16 Points 8 Points 0 Points No grammar, spelling, punctuation, reference, or citation errors and are consistent with formal academic writing and APA format, as expressed in the current edition One grammar, spelling, punctuation, reference, or citation error that is consistent with formal academic writing and APA format, as expressed in the current edition. Two grammar, spelling, punctuation, reference, or citation errors that are consistent with formal academic writing and APA format, as expressed in the current edition. Three grammar, spelling, punctuation, reference, or citation errors; is not consistent with formal academic writing and APA format, as expressed in the current edition. Four grammar, spelling, punctuation, reference, or citation errors; is not consistent with formal academic writing and APA format, as expressed in the current edition. Format Subtotal _____of 20 points Total Points _____of 100 points 4 -
NR632W2MonitorandControlTemplate.docx
Chamberlain College of Nursing NR632 Nurse Executive CGE II
Project Monitoring-and-Controlling Template
Project Title:
Project-Management Knowledge Area
Monitoring and Controlling Frequency* Detailed Description of F or E Ratings** Process Outputs Integration Management Scope Management Time Management Cost Management Quality Management Human-Resource Management Communication Management Risk Management Procurement Management Frequency Key: N=Never, O = Occasional (1-4 times), F= Frequent (5-10 times), E = Excessive (>10 times)
*Record the number of times that you had to monitor and control each knowledge area during the project, using the frequency key above.
** Write a detailed description about any occurrences that happened more than 5 times or were rated frequent (F) or excessive (E).
Summary
Write a summary paragraph describing the results of the monitoring and controlling of processes and outputs that you conducted during your project.
-
NR632W2MonitorandControlSample.docx
Chamberlain College of Nursing NR632 Nurse Executive II
Monitoring-and-Controlling Sample
Project Management Knowledge Area
Monitoring and Controlling Frequency Detailed Description of F or E ratings Process Outputs Integration Management Monitor-and-control project work Integrate change control
Recommended corrective actions Rejected change requests
F N
We were dealing with new technology that needed to be tweaked as the project progressed. The team recognized the need for corrective action in order to integrate other technologies or refine the product. Scope Management Scope verification Requested changes N Time Management Schedule control Requested changes F As the technology integration neared, both companies (Metaview and MTM) needed additional time to integrate the Cyves and the portal-access technology. There were also newer programs that recently entered the market that were added to the project to enhance the deliverable. Cost Management Controlling costs Requested changes O Quality Management Quality control Quality baseline compared to actual deliverables E The quality of the product required iterative phases of quality control. The comparisons from expected to actual were continuous due to the technologic changes. Human-Resource Management Manage project team Continue to complete the document as above Communication Management Risk management Procurement Management Frequency Key: N=Never, O = Occasional (1-4 times), F= Frequent (5-10 times), E = Excessive (>10 times)
Record the number of times that you had to monitor and control each knowledge area during the project, using the frequency key above.
Write a detailed description about any occurrences that happened more than 5 times or were rated frequent (F) or excessive (E).
Write a summary paragraph describing the results of the monitoring and controlling of processes and outputs that you conducted during your project. NR632 Wk2 BA Discussion